| 3/5 | 7/12/04 12:09 AM | construction2 |
|
Constrution on the building next door - the small poles at angles on the top floor are holding up the frame for the roof, then concrete is poured in and the frames removed. Very little is made of wood because it rots too fast in the hot, wet climate
|